Projects

EMS Offshore offices.

EMS office IMG_0167 IMG_0168 IMG_0169 IMG_0170 IMG_0377

Access Tower.

IMG_1447 IMG_1448 IMG_1449 IMG_1450 IMG_1450-Construction

 

Chutes and Conveyor sections.

IMG_0281 IMG_0297 IMG_0308 IMG_0309 IMG_0310(1) IMG_0310 IMG_0311

Fabricated Handrail sections.

IMG_0084 IMG_0546 IMG_0813

  • To whom it may concern, Reference for Engineering Management Systems (EMS) Brightwater has worked with EMS on various projects since 2013, during this time EMS have displayed strong leadership abilities, logical thinking abilities, and the ability to work well with both internal teams and external strategic partners. EMS has always shown grea

    David Gerrard - Brightwater

  • May 2015 - We decided to consider EMS (on recommendation) for a large project we had in Perth. The pricing we had originally considered was significantly more than the proposal from EMS which was a great start. Once the project was under way we had many frustrating changes requested from our client. Thankfully, Mardy made these adjustments quickly

    John Gilbertson - Operations Manager, SFCT Pty Ltd

  • In 2014 we installed a large boiler on a dairy plant in Canterbury, NZ. The structural steel for the buildings as well as the steel for several pieces of coal handling equipment were sourced from China. Mardy looked after all the quality aspects of the fabrication as well as the adherence to our strict schedule. Mardy made sure that all steel was s

    Jack Cerfontaine - Project Operations Team Leader at Brightwater Engineering

  • We initially didn’t consider fabricating in China. Upon meeting Mardy and hearing of his motivation and reassurances, we were impressed. Really appreciating his personal touch, availability, regular email updates including photos and suggested improvements. The cost savings are tremendous and beyond our belief. The completed works saved over 50%

    Kees Witteman - Home Owner